Planning and contract control for Ghana's building contractors
Know your handover date. Know what moves it.
BlokFactory keeps your programme, payments and contract clocks on one page. Ask a question and it answers from them. Give it a letter and it finds the dates, the clause and the reply you owe.
Open the live demoSet up your own job
No sign-up. It runs in your browser and keeps your jobs on your own device.
A job rarely fails on the concrete. It fails on a late truss drawing, a certificate nobody followed up, a claim notice sent on day twenty-nine. BlokFactory watches the programme, the money and the clocks. It warns you before it matters.
01Planning
A programme that shows what drives the handover.
Each activity has its working days, what it waits for and its spare time. A scheduling engine works out which work can't slip (the critical path). It does the same sum your planner does by hand, so the dates are exact and do not drift. This is the demo job. Watch one late drawing move the handover.
The demo job, as it was on 20 Nov 2026. The dates, and which work can't slip, come from the scheduling engine, not from AI. The live demo runs from today's date, so its figures will differ.
What can't slip
See which work has no spare time left and which can wait. The original plan shows under the forecast, so you can see any slip.
Next 3 weeks
What starts soon, and what must be ready first: drawings, materials, labour, approvals. Anything not ready shows red, with who must clear it and by when.
What-if
Click a bar, add 5 days to it, and see the new handover date before you agree to anything.
02The assistant
Answers from your programme, your payments and your contract.
"What do we do this week, in order?" "If the truss detail comes on 9 December, when do we finish?" "Why are we late, and what can we claim?" Each answer links to the activities it names, so you can check them on the programme.
- Exact
- The same engines that draw the programme answer everyday questions. No AI.
- AI
- Harder questions go to the AI. It can only use those same exact tools. Every answer shows which one answered.
- Your decision
- It suggests changes and drafts notices. A person must accept them. It never sends a letter.
Assistant Demo job, as it stood on 20 Nov 2026
Has certificate 2 been paid?
Exact. Calculated from the records. No AI.
Not yet. Certificate 2, for GH₵ 238,500, was due on 9 Nov 2026, 56 days after the Statement (GCC 14.7). It is 11 days overdue.
Suggested task
Follow up payment of certificate 2 (GH₵238,500)
AddAdded to the board
Walls on the nurses' quarters are about 70% done.
AI. Written from the project's own tools.
That's A15, blockwork to wall plate. I can record it at 70%. Nothing changes until you accept.
Progress
Record A15 at 70%
AcceptAccepted, and logged
Draft the delay notice for the truss detail.
Exact. Fixed template and the record. No AI.
Drafted from the programme and the site diary. Under GCC 20.1 it must reach the Engineer by 4 Dec 2026.
Letter
Notice of delay: roof truss detail A12
Saved as a draft, never sent
Demo job, 20 Nov 2026
03Documents and letters
Letters checked for dates, clauses and deadlines.
A site runs on letters: the consultant's instruction, the Engineer's certificate, the notice from the Assembly. BlokFactory reads each one with fixed rules. It picks out what a busy team misses: the dates, the clause that starts a clock, and what you must do by when.
2. The Works and the Contract expected to be awarded under this IFT is: CONSTUCTION OF 1NO. CHPS COMPOUND, NURSES QUARTERS AND WATER SYSTEM AT KENYASI and to be completed in 6MNTHS calendar months.
9. A Pre-Tender meeting shall take place on 23/11/2026 at 14:30 local time at the ASUTIFI NORTH DISTRICT ASSEMBLY CONFERENCE HALL.
10. The deadline for submission of Tenders is 30/11/2026 at 13:00 local time.
Read from the notice
- Works period
- 6 monthsWritten as "6MNTHS". The rules read it as 6.
- Pre-tender meeting
- 23 Nov 2026, 14:30Asutifi North District Assembly conference hall
- Tender deadline
- 30 Nov 2026, 13:00Local time
Fixed rules, no AI. Each finding points to the words it came from, so you can check it quickly.
Try filing a letter in the demo jobTender notices
BlokFactory reads each GHANEPS works notice the same way. It finds the deadline, the usual last date for questions, the works period and any blanks the buyer did not fill.
See open tenders04Works with
Works with what you already use.
Start from the programme your planner already keeps, the rows in your spreadsheet and the letters on your desk. No retyping.
-
Open .xml or a CSV export
Microsoft Project
Sections, all link types with their lag, progress, the calendar, holidays and your original plan all come in. BlokFactory checks its dates against Project's own.
-
Paste rows
Excel and other spreadsheets
Copy the activity rows from a spreadsheet and paste them in.
-
Read for you
GHANEPS tender notices
BlokFactory reads each works notice for its deadline, the last date for questions and the blanks to ask the buyer about.
-
Paste, .txt or .eml
Letters and documents
It picks out the dates, what you must do, the clause and the clock it starts.
-
Export and import
A project file
Save a whole project to one file. Open it on another computer, or keep it as a backup.
Also in BlokFactory
-
Director's view
All projects and people on one page. Decisions only the director can make come first.
-
Change history
Who did what, when, and in which project. When someone accepts a change from the assistant, their name is logged with it.
-
Clocks on every claim
Each delay starts its 28-day notice clock. Each certificate starts its payment clock. You see the days left, not only a date.
05The rest of the job
The records behind the programme.
The programme comes first. Behind it are the records that protect your money and your time. Each one links to its activity. Set up your own job from a template, or paste in your activity list. It is kept in your browser, on your device.
- S-01
Payments
Follow each certificate from Statement to payment. Under the PPA works conditions, the Engineer certifies within 28 days. The Employer pays within 56 days of the Statement (GCC 14.6, 14.7). A late payment shows as overdue from the first day.
- S-02
Delays and notices
The claim notice must reach the Engineer within 28 days of when you knew of the event, or the claim is lost (GCC 20.1). Each delay gets its clock. BlokFactory drafts the notice from the programme and the diary. You check it and send it.
- S-03
Site diary
Weather, people on site, work done, problems. It is the record behind every claim, linked to its activity.
- S-04
Task board
Who does what this week. It suggests tasks from the programme, the payments, the notices and the tenders. Nothing goes on the board until a person adds it.
- S-05
Contract
The PPA standard conditions for works in plain words, with the clause and page. Next to them are the figures from your own contract.
06What's real
What is real in the demo, and what is made up.
This is a working demo. Here is what you are looking at when you open it.
Real
- GHANEPS works tender notices, word for word (copied in mid-November 2026; they have now closed or will soon)
- The contract rules: PPA standard conditions for works (Medium Contracts), given in plain words with clause and page
- The scheduling, money and notice-clock engines
Made up
- The contractor, Odum Works Ltd, its people and its live project
- The letters on file in the demo
- The programme, progress, certificates and diary
- Contract figures a real contract fills in: sum, damages rate, retention
Not built yet
- Opening Primavera files directly (for now you paste the activity rows in)
Know your handover date before the consultant asks.
Open the live demoSet up your own jobNo sign-up. Try the demo, or set up your own job in about 2 minutes.